• Home
  • Products
    Water drilling machine
    DTH blasting hole drill rig
    Rope Coring Drill Rig
    Tunneling drill rig
    Photovoltaic pile drilling rig
    Air compressor
    Spare parts
  • About Us
  • News
  • Case
  • Contact Us
Get A Quote

News

Home > News
  • What are some tips for operating a hydraulic water well drilling rig? 

    February 20 , 2025

    As an efficient and professional drilling equipment, hydraulic water well drilling rig plays a vital role in obtaining groundwater resources, conducting geological exploration and geothermal development. Understanding its correct operation process, common faults and solutions is of great significance to ensure the smooth progress of drilling work, improve work efficiency, extend the service life of equipment and ensure operation safety.

    Learn More >
  • How to choose mud pump or air compressor system for UY crawler water well drilling rig?

    February 12 , 2025

    In water well drilling operation, both mud pump system and air compressor system play a key role, which directly affects drilling efficiency, quality and adaptability to different geological conditions. The actual purchase, customers often put forward a variety of questions, the following is a detailed answer for you.

    Learn More >
  • How to clean the mud pump of a water well drilling rig?

    January 18 , 2025

    How to clean the mud pump of a water well drilling rig? 1. Drain residual mud: Drain as much mud as possible from the pump. 2. Disassemble parts: Disassemble removable parts according to the pump manual. 3. Remove solid impurities: Use a brush or other tool to remove solid impurities from the pump and parts. 4. Clean the pump body: Rinse the inside of the pump body with clean water to remove residual mud. 5. Clean parts: Clean the disassembled parts to remove dirt and impurities. 6. Check parts: Check if the parts are worn or damaged, and repair or replace them if necessary. 7. Reassemble: Assemble the cleaned parts back into the pump body in the correct order.

    Learn More >
  • Water well drilling rig system composition

    January 15 , 2025

    Water well drilling rig system composition 1. Power system, equipment that provides energy for the entire drilling rig; 2. Working system, equipment that works according to process requirements; 3. Transmission system, equipment that transmits, transfers and distributes energy to the working unit; 4. Control system, controls each system and equipment, and works in a coordinated and accurate manner according to the requirements of the process; 5. Auxiliary system, equipment that assists the main system in working.

    Learn More >
  • Safe operation procedures for photovoltaic pile drilling rig

    January 15 , 2025

    Safe operation procedures for photovoltaic pile drilling rig 1. Check whether the supporting equipment, auxiliary equipment, water and electricity equipment and accessories are complete and intact, whether the relevant coordination work is in place, and whether they can meet the needs of normal work. 2. Know the construction needs and geological structure in detail, and select tools and accessories that meet the functions of the drilling rig and construction needs. 3. The work site should be flat and solid, meet the normal operation and load-bearing requirements of the drilling rig, and ensure the unobstructed and safe main channel. 4. The ground slope of the drilling rig working environment should be less than 5 degrees. When the drilling rig works on the inclined ground, the mast must be adjusted vertically to ensure the verticality and accuracy of the drill hole. 5. Check whether the oil level and lubrication points of each part of the photovoltaic pile driver meet the specified specifications and whether the hydraulic system is normal. 6. No unrelated personnel are allowed to enter the operating room; all personnel are not allowed to stay on the crawler and the frame; it is forbidden to pile up fuel in the...

    Learn More >
  • 300m Water Well Drilling Rig

    December 23 , 2024

    The 300-meter water well drill rig is designed with advanced technology and high-quality materials to ensure efficient and precise drilling operations. With a maximum drilling depth of 300 meters, it can reach deep underground to extract water. The drill is equipped with a powerful diesel engine that provides sufficient torque and speed. Its stable structure and reliable control system make it suitable for various geological conditions.

    Learn More >
‹23456›
  • 0086-371-63699132
  • info@sinounique.com

“Client’s Satisfaction Is Always Our Pursuit!”

products

  • Water drilling machine
  • DTH blasting hole drill rig
  • Rope Coring Drill Rig
  • Tunneling drill rig
  • Photovoltaic pile drilling rig
  • Air compressor
  • Spare parts

contact us

  • Email: info@sinounique.com
  • Tel: 0086-371-63699132
  • Whatsapp: 86-15890609031
  • Factory Add: San Li Zhuang Industrial Park, Xingyang, Zhengzhou City, Henan, China

Inquiry


    Copyright © 2021 Zhengzhou unique industrial equipment co.,ltd
    Home Tel Mail Inquiry